柔性版印刷行业

柔版印刷工业- RTO项目概述

2017年1月4日上午9:25 发表的

柔版印刷工业-船舶 & 海岸 RTO项目概述

历史

A flexographic company that produces printed wrapping and packaging materials for the floral, 礼物, 食品和糖果工业咨询船舶 & 海岸环境公司. (S&SE) to design a state-of-the-art 减少挥发性有机化合物 system for a planned facility expansion.

The facility expansion included addition of several new pieces of manufacturing equipment. S&SE. also assisted with the air permit application process for the plant expansion.

柔性版印刷行业

解决方案

In order to reduce air pollution from the facilities various manufacturing processes and to improve air quality for their workers, 客户问:“发货” & 海岸环境 to develop a design that would provide a reliable and cost effective solution. S&SE team of engineers and technicians visited the facility to observe the manufacturing processes and to take flow, 温度和VOC浓度测量. After review of the data collected by our engineering team, a recommendation was made to address all the areas of concern.

The recommended solution utilized a 再生热氧化剂 (RTO), VOC收集系统, 混合箱, and permanent total enclosure to capture and destroy the VOC emissions. The RTOs unique system design provides for an extremely energy-efficient operation. Through the use of two built-in heat exchange chambers with high-quality structured ceramic heat recovery media approximately 95% of the heat of combustion generated by the oxidation process, 销毁收集的VOCs, is recovered to minimize RTO operating fuel requirements. 除了, 进一步降低氧化剂燃料消耗, the custom designed VOC收集系统 and permanent total enclosure (PTE) provide for optimal collection of the VOCs from each emission source in the facility. The BTUs (fuel) contributed by the VOCs collected often provide for self-sustaining operation of the RTO, allowing the burner to be shut-off after the oxidizer is brought up to operating temperature and the process emissions are brought online. A variable frequency drive (VFD) for the main process blower and 混合箱 is also used to modulate the emissions from the various emission sources to optimize energy conservation of the RTO as it operates under various conditions; modulating capacity as each sources is brought on and off-line. 在工程设计阶段, all equipment dimensions and weights are finalized and reviewed with the customer for best configuration at the installation site.

The preliminary design for the RTO allowed for installation in a given space with minimal interruption to the existing manufacturing operations during start-up and commissioning. S&SE was instrumental in assisting the customer with the application process for cash incentives based on the energy-efficiency of the RTO. Much to the surprise of the customer the project was approved for an impressive cash incentive of more than $350,000.